Wednesday, September 28, 2011

27/09/2011 - Brickwork done, Study in, tiles fixed. Alex's holes for deck started, deck tiling done, flooring downstairs started.





Study bench and shelves installed.
Ban lam viec & ke sach da duoc lap dat.


Study bench and shelves installed.
Ban lam viec & ke sach da duoc lap dat.


Brickwork understairs and bedroom 1 done.
Da lat gach tuong khu vuc cau thang & ben ngoai phong ngu 1.



Brickwork understairs done.
Da lat gach tuong khu vuc cau thang.


Living room walls painted.
Da son tuong phong an.


Hallway ceiling painted.
Da son tran loi di tang duoi.


Shower wall tiled in ground floor bathroom done.
Da lat gach tuong phong tam tang duoi.



No comments: