Monday, September 5, 2011

05/09/2011 - Bricks moved, sites clean up, second flight of stairs with flooring, upstairs cupboards started.


Deck clean up.
San vuon da duoc don dep sach se.


Spotted gum floor landing.
Chieu nghi cau thang da duoc lat go.


Second flight of stairs laid.
Cac bac thang di len da duoc lat go.


Cupboard in bedroom 2 upper floor.
Tu dung quan ao trong phong ngu 2 o tang tren.


Cupboard in bedroom 2 upper floor.
Tu dung quan ao trong phong ngu 2 o tang tren.


Spotted gum flooring for stairs.
Lat go cho toan bo cau thang.




Bricks located outside stairwell.
Gach da duoc doi vao ben ngoai cau thang.