Monday, September 12, 2011

12/09/2011 - Toilet, basins, cooktop installed, more door handles cut, more door stops, more metal capping for roof, more painting.


Kitchen wall painted.
Tuong phong an da duoc son.


Cooktop installed.
Bep da duoc lap dat.


Toilet installed.
Bon ve sinh da duoc lap dat.


Vanity sink in bathroom ground floor installed.
Da lap dat bon rua tay trong phong tam o tang duoi.


Toilet installed.
Bon ve sinh da duoc lap dat.


Wood for study & stairwell walls installed.
Da lat go mat tuong phong lam viec & chieu nghi cau thang.


Vanity sink in bathroom upper floor installed.
Da lap dat bon rua tay trong phong tam o tang tren.


Bedroom 2 upper floor.
Phong ngu 2 o tang tren.





Metal capping for roof.


Metal capping for roof.


Weatherboard removed.


Gas connected for cooktop.
Da noi gas cho bep.



Kitchen doors.

No comments: