15/09/2011 - More brickwork, more painting, electrical fit out started.


All ceiling fans purchased.
Da mua toan bo quat tran.


Down lights and four smoke alarms.
Den tran trong phong & 4 thiet bi bao chay.


Down lights in lounge room installed.
Da lap dat den tran trong phong khach.


Data cables labelled.
Gan nhan cho cac cap du lieu.


Down lights in living room installed.
Da lap dat den tran trong phong an.


Down lights in living room installed.
Da lap dat den tran trong phong an.


Down light in ground floor bathroom installed.
Da lap dat den tran trong phong tam o tang duoi.



Down lights in bedroom 2 upper floor installed.
Da lap dat den tran trong phong ngu 2 o tang tren.


Brickwork above carpot done.
Da lat gach tuong o phia tren nha de xe hoi.






Entrance and smoke alarm.
Loi vao & thiet bi bao chay.


Linen cupboard pipe boxed and painted.
Da lam khung & son tu dung chan men.


Hallway door painted.
Da son cua hanh lang o tang duoi.


Down lights in bedroom 2 upper floor installed.
Da lap dat den tran trong phong ngu 2 o tang tren.


Down lights in WIR installed.
Da lap dat den tran cho phong quan ao trong phong ngu chinh.


Brickwork above carpot done.
Da lat gach tuong o phia tren nha de xe hoi.





Living room data cable labelled.
Thiet bi cap du lieu trong phong an da duoc gan nhan.