30/09/2011 - Skirting and doors painted, More brickwork for Alex.


Living room.
Phong an.


Living room.
Phong an.


Living room.
Phong an.


Bedroom 2 upper floor cupboard doors painted.
Da son cac cua tu quan ao trong phong ngu 2 o tang tren.


Study room.
Phong lam viec.


Thursday, September 29, 2011

29/09/2011 - Skirtings painted, Alex's skirting installed.


Living room skirtings painted.
Da son chan tuong phong an.


Living room skirtings painted.
Da son chan tuong phong an.


Living room windows skirting painted.
Da son khung cua so phong an.


Stairs skirtings painted.
Da son chan tuong cau thang.


Bedroom 2 upper floor skirtings painted.
Da son chan tuong phong ngu 2 o tang tren.







Brickwork for power meter box done.

Wednesday, September 28, 2011

28/09/2011 - More electrical, more painting - Alex's deck posts done, skirting started. Water leaks.


Power switch for kitchen bench.
O cam dien cho mat bep.


Power switches for kitchen bench.
Cac o cam dien cho mat bep.


Wall switches for living room.
Cac o cam dien trong phong an.


Power switch for vanity bench in ground floor bathroom.
O cam dien cho bon rua mat trong phong tam o tang duoi.


Data patch panels understairs.


Power panels understairs.


Study bench and shelves upper floor.
Ban lam viec & ke sach trong phong lam viec o tang tren.


Rain water leaks in bedroom 2 upper floor.


Stairs wall trim.




Rain water leaks in bedroom 1 ground floor.


Rain water leaks in bedroom 1 ground floor.


Rain water leaks in WIR upper floor.



Rain water leaks in WIR upper floor.

27/09/2011 - Brickwork done, Study in, tiles fixed. Alex's holes for deck started, deck tiling done, flooring downstairs started.





Study bench and shelves installed.
Ban lam viec & ke sach da duoc lap dat.


Study bench and shelves installed.
Ban lam viec & ke sach da duoc lap dat.


Brickwork understairs and bedroom 1 done.
Da lat gach tuong khu vuc cau thang & ben ngoai phong ngu 1.



Brickwork understairs done.
Da lat gach tuong khu vuc cau thang.


Living room walls painted.
Da son tuong phong an.


Hallway ceiling painted.
Da son tran loi di tang duoi.


Shower wall tiled in ground floor bathroom done.
Da lat gach tuong phong tam tang duoi.



Monday, September 26, 2011

26/09/2011 - Deck Tiles done, downstairs painted. Alex's flooring upstairs and deck started.


Living room painted.
Phong an da duoc son.


Living room painted.
Phong an da duoc son.


Understairs painted.
Ben duoi cau thang da duoc son.


Ground floor walls painted.
Cac tuong o tang duoi da duoc son.


Deck upper floor tiled.
Ban cong san thuong da duoc lat gach.