Friday, November 25, 2011

25/11/2011 - Fan's and electrical continues, Alex's aircon installed, shoji screen, and holes cleaned out.


More foam delivered.



Stairwell fan installed.
Da lap dat quat tran cho cau thang.


Stairwell fan installed.
Da lap dat quat tran cho cau thang.


Fan in bedroom 2 upper floor.
Da dieu chinh do cao cua quat trong phong ngu 2 o tang tren.


Downlights in study installed.
Da lap dat den tran cho phong lam viec.



Strip lights for study bench installed.
Da lap dat den cho ban lam viec.


Stairwell fan installed.
Da lap dat quat tran cho cau thang.


Stairwell fan installed.
Da lap dat quat tran cho cau thang.