22/11/2011 - Electrical continues, and canopies started.


Canopy for window started.
Mai che cua so phia truoc.


Electrical for deck ground floor installed.
Da lap dat o dien cho san sau.


Power plates in kitchen installed.
Da lap dat xong o dien cho bep.


Power plates in ground floor bathroom installed.
Da lap dat xong o dien cho phong tam o tang duoi.


Shower rail in ground floor bathroom installed.
Da lap dat voi sen cho phong tam o tang duoi.


Stairs foot lights and wall lights installed.
Da lap dat den loi di cau thang & den tuong cau thang.


Stairs foot lights and wall lights installed.
Da lap dat den loi di cau thang & den tuong cau thang.


Stairs foot lights and wall lights installed.
Da lap dat den loi di cau thang & den tuong cau thang.


Mirror light and heater in upper floor bathroom installed.
Da lap dat den soi guong & may suoi cho phong tam o tang tren.


Outside power station installed.
Da lap dat o dien ben ngoai.



Canopy for window started.
Mai che cua so phia truoc.


Canopy for window started.
Mai che cua so phia truoc.



Electrical in the shed.
Cac o dien trong nha kho.