11/08/2011 - Door frames started, walls patched and painted, under stairs plastered, bath hob done.


Door frame for bathroom ground floor.
Khung cua phong tam o tang duoi.


Overhead cupboards in bedroom 1 ground floor.
Tu o phia tren trong phong ngu 1 tang duoi.


Hallway towards master bedroom.
Hanh lang ve phia phong ngu chinh.


Cupboard frame for bedroom 2 upper floor.
Khung tu trong phong ngu 2 o tang tren.


Door frame for bedroom 2 upper floor.
Khung cua cho phong ngu 2 o tang tren.


Master bedroom walls painted.
Tuong trong phong ngu chinh da duoc son.


Door frame in for bathroom upper floor.
Khung cua cho phong tam o tang tren da lap dat xong.


Hallway North wall ground floor towards west door.


Ceiling for under stairs.
Tran ben duoi cau thang da duoc lap dat.


Bathroom ground floor.
Phong tam o tang duoi.


Flooring stored in kitchen.