Friday, July 8, 2011

27/06/2011 - Plumbing done, bricks delivered, fron door widened.


Kitchen (south wall).
Phong bep (tuong huong Nam).


Kitchen.
Phong bep.


Kitchen (West wall).
Phong bep (tuong huong Tay).


Bathroom ground floor.
Phong tam tang duoi.


Bathroom ground floor (South wall).
Phong tam tang duoi (tuong huong Nam).


Hall way view to front door.
Nhin tu loi di ra cua truoc.

No comments: