Thursday, November 24, 2011

24/11/2011 - Alex's carport continues, more painting, Alex's shed moved back.




Ground floor deck.
San vuon phia sau.


Milo in ground floor deck.
Milo o san vuon phia sau.


Painting done for corridor ceiling upper floor.
Da son xong tran loi di o tang tren.



Architraves for lounge room painted.
Da son khung cua phong khach.



Wednesday, November 23, 2011

23/11/2011 - Alex's blinds installed, more canopy work, more foam, hot water service moved.




Canopy for the front window.
Mai che cua so phia truoc.


Canopy for the front window.
Mai che cua so phia truoc.


Canopy for the front window.
Mai che cua so phia truoc.


Foam for study and upper floor bathroom.


Foam for study and upper floor bathroom.


Hot water service relocated to the deck upper floor.
Da doi may nuoc nong len ban cong tang tren.



Hot water service relocated to the deck upper floor.
Da doi may nuoc nong len ban cong tang tren.

Tuesday, November 22, 2011

22/11/2011 - Electrical continues, and canopies started.


Canopy for window started.
Mai che cua so phia truoc.


Electrical for deck ground floor installed.
Da lap dat o dien cho san sau.


Power plates in kitchen installed.
Da lap dat xong o dien cho bep.


Power plates in ground floor bathroom installed.
Da lap dat xong o dien cho phong tam o tang duoi.


Shower rail in ground floor bathroom installed.
Da lap dat voi sen cho phong tam o tang duoi.


Stairs foot lights and wall lights installed.
Da lap dat den loi di cau thang & den tuong cau thang.


Stairs foot lights and wall lights installed.
Da lap dat den loi di cau thang & den tuong cau thang.


Stairs foot lights and wall lights installed.
Da lap dat den loi di cau thang & den tuong cau thang.


Mirror light and heater in upper floor bathroom installed.
Da lap dat den soi guong & may suoi cho phong tam o tang tren.


Outside power station installed.
Da lap dat o dien ben ngoai.



Canopy for window started.
Mai che cua so phia truoc.


Canopy for window started.
Mai che cua so phia truoc.



Electrical in the shed.
Cac o dien trong nha kho.

Monday, November 21, 2011

21/11/2011 - Carpet in, Shoji screen done, insulation in outside roof.


Carpet in bedroom 1 ground floor.
Da lot tham cho phong ngu 1 o tang duoi.


Shoji screen for lounge room.
Da hoan thanh cua lua cho phong khach.


Carpet in bedroom 2 upper floor.
Da lot tham cho phong ngu 2 o tang tren.


Carpet in WIR upper floor.
Da lot tham cho phong de quan ao o tang tren.


Carpet in WIR upper floor.
Da lot tham cho phong de quan ao o tang tren.


Carpet in master bedroom upper floor.
Da lot tham cho phong ngu chinh o tang tren.


Shoji screen installed for loung room.
Da lap cua lua cho phong khach.


Shoji screen installed for loung room (internal view).
Da lap cua lua cho phong khach.






Insulation in outside roof.
Da lap tham cach nhiet cho mai hien.

19/11/2011 - Carpet ramp, and shoji peek preview.


Carpet ramp for bedroom 1 ground floor.



Shoji peek for lounge room.

Friday, November 18, 2011

18/11/2011 - Tile caulking and shoji screen doors arrived.


Carport cleaned up.


Tile caulking.


Tile caulking.


Tile caulking.


Shoji screen doors for lounge room installed.
Da lap dat cua lua cho phong khach.


Tile caulking.


Tile caulking.