Friday, June 10, 2011

10/06/2011 - More plumbing done, Door Cavities Installed, Alexs ridge roof capping done.


Kitchen plumbing done (south wall).
Duong ong nuoc cho phong bep.


Kitchen plumbing (west wall).
Duong ong nuoc cho phong bep.


Bathroom ground floor plumbing.
Hoan tat duong ong nuoc cho phong tam o tang duoi.


Bathroom ground floor.
Phong tam o tang duoi.


Door cavities for lounge room.
Khung cua cho phong khach o tang duoi.


Lounge room.
Phong khach.


Entrance and lounge room.
Sanh chinh va phong khach.

Thursday, June 9, 2011

09/06/2011 - Bathroom downstairs plumbing started, door cavities for sliding doors arrived.


Wall between kitchen & bathroom ground floor.
Tuong ngan giua khu vuc bep & phong tam tang duoi.


Plumbing in bathroom ground floor.
Duong ong nuoc trong phong tam tang duoi.






Existing plumbing pieces.

Wednesday, June 8, 2011

08/06/2011 - Big hole in bathroom and plumbing started.


Plumbing for bathroom upper floor.
Duong ong nuoc cho phong tam o tang tren.


Upper floor bathroom.
Phong tam o tang tren.


Upper floor bathroom.
Phong tam o tang tren.



Ground floor bathroom.
Phong tam o tang duoi.


Ground floor cupboard.
Tu de do dac o tang duoi.



Ground floor bathroom (from the door).
Phong tam o tang duoi (nhin tu cua vao).

Tuesday, June 7, 2011

07/06/2011 - Bathroom dug, more on Alex's bathrooms,front window installed.





Front window in place.
Cua so tang tren da duoc lap dat.


Corridor upper floor.
Hanh lang tang tren.


Front window in bedroom 2 upper floor.
Cua so phia truoc cua phong ngu 2 o tang tren.

Monday, June 6, 2011

06/06/2011 - Window frame in place, Alex's bathroom dug up for bath and kitchen Tiles Removed





Western window frame in place.
Khung cua so phia Tay.


Western window frame (internal view).
Khung cua so phia Tay (nhin tu ben trong).

Wednesday, June 1, 2011