24/06/2011 - Wall insulation mostly done, Alex's plaster continued.


Ceiling insulation for hall way ground floor.
Cach nhiet tran loi di tang duoi.


Bathroom ground floor.
Phong tam tang duoi.


Insulation packages in study room.
Cac tham cach nhiet trong phong lam viec.


Insulation packages in walk-in-robe.
Cac tui tham cach nhiet trong phong de quan ao.


Wall insulation in bedroom 2 upper floor.
Cach nhiet tuong phong ngu so 2 tang tren.


Bedroom 2 upper floor.
Phong ngu 2 tang tren.



Wall insulation in study room upper floor.
Cach nhiet tuong phong lam viec tang tren.


Wall insulation for corridor upper floor.
Cach nhiet tuong loi di tang tren.


Ceiling & wall insulation for bathroom upper floor.
Cach nhiet tran & tuong phong tam tang tren.


Ceiling & wall insulation for WIR upper floor.
Cach nhiet tran & tuong phong de quan ao o tang tren.


Wall insulation for master bedroom upper floor.
Cach nhiet tuong phong ngu chinh o tang tren.



Thursday, June 23, 2011

23/06/2011 - Roof Insulation in house up and down done, more plumbing, plaster delivered, Alex's plaster on ceiling upstairs started.


Bathroom upper floor.
Phong tam o tang tren.



WIR.
Phong de quan ao.


Kitchen ceiling insulation.
Cach nhiet tran phong bep.


Staircase insulation (looking up from ground floor).
Cach nhiet cau thang (nhin tu duoi len).


Ceiling insulation in kitchen.
Cach nhiet tran phong bep.


Ceiling insulation in bathroom ground floor.
Cach nhiet tran phong tam o tang duoi.


Kitchen (south wall).
Phong bep.



Hall way insulation (View from entrance through lounge room to staircase).
Cach nhiet loi di (nhin tu loi vao, thong qua phong khach den cau thang).


Insulation packages in lounge room.
Cac tham cach nhiet trong phong khach.


Ceiling insulation in bedroom 1 ground floor.
Cach nhiet tran phong ngu 1 o tang duoi.


Ceiling insulation in bathroom ground floor.
Cach nhiet tran phong tam tang duoi.


Wall between bathroom and bedroom 1 ground floor.
Tuong ngan giua phong tam & phong ngu 1 tang duoi.


Ceiling insulation in bedroom 2 upper floor.
Cach nhiet tran phong ngu 2 tang tren.


Corridor & Bedroom 2 upper floor.
Hanh lang & phong ngu 2 o tang tren.


Ceiling insulation in master bedroom upper floor.
Cach nhiet tran phong ngu chinh o tang tren.

Location for hot water service on the deck upper floor.
Vi tri dat may nuoc nong o ban cong tang tren.

22/06/2011 - Insulation Delivered, and Alex's batons upstairs done.


Lounge room.
Phong khach.




21/06/2011 - Plastic up to protect kitchen from weather.

Saturday, June 18, 2011

17/06/2011 - More upstairs plumbing done.


Sewer pipe inside cupboard ground floor.
Duong thoat nuoc tu tang tren xuong tang duoi.


Sewer pipe in ceiling of bedroom 1 ground floor.
Duong ong thoat nuoc tren tran phong ngu 1 tang duoi.


Bathroom upper floor.
Phong tam o tang tren.


Bathroom upper floor.
Phong tam o tang tren.



Bathroom upper floor.
Phong tam o tang tren.

Thursday, June 16, 2011

16/06/2011 - Sewer waste started, and site rubbish removed.


Bathroom ground floor.
Phong tam o tang duoi.


Bathroom ground floor.
Phong tam o tang duoi.


Sewer pipe along cupboard ground floor.
Duong thoat nuoc thai xuong phong tam tang duoi.


Sewer pipe between two floors.
Duong thoat nuoc thai giua tang duoi va tang tren.




Sewer pipe along bedroom 1 ground floor.
Duong thoat nuoc thai di ngang phong ngu 1 o tang duoi.

Wednesday, June 15, 2011

15/06/2011 - Bath/Shower Mixers installed and kitchen pipe in, and some deck fashing detail



Bathroom upper floor.
Phong tam o tang tren.


Bathroom ground floor.
Phong tam o tang duoi.


Kitchen (south wall).
Phong bep.


Kitchen (west wall).
Phong bep.



Deck upper floor.