25/05/2011 - Aircon rough in done, More guttering and capping on Alex's House
Bedroom 2 upper floor.
Wall between master bedroom & WIR.
View towards under stairwell from lounge room.
Under stairwell.
Stairwell landing.
View towards stairwell from bedroom 1.
Monday, May 23, 2011
Tuesday, May 17, 2011
17/05/2011 - Electrical and Data rough in complete.
Under stairwell.
Study room.
Phong lam viec.
Phong lam viec.
Bathroom upper floor.
Phong tam o tang tren.
Phong tam o tang tren.
Master bedroom.
Phong ngu chinh.
Phong ngu chinh.
Master bedroom entrance.
Loi vao phong ngu chinh.
Loi vao phong ngu chinh.
Hallway ground floor.
Loi di tang tret.
Loi di tang tret.
Shed.
Nha kho.
Nha kho.
Saturday, May 14, 2011
13/05/2011 - Aircon frame done, cupboard frame done, ceiling leveling started.
Cupboard in bedroom 2 upper floor.
Tu ke trong phong ngu 2 o tang tren.
Tu ke trong phong ngu 2 o tang tren.
Study room & stairwell.
Phong lam viec & cau thang.
Phong lam viec & cau thang.
Understair aircon unit.
May lanh trung tam dat o duoi cau thang.
May lanh trung tam dat o duoi cau thang.
Thursday, May 12, 2011
12/05/2011 - More stair area done, half height study wall frame, cupboard framed
Stairwell (view from ground floor).
Stairwell.
Bedroom 2 upper floor.
Study room.